© Yan & Partners, 2026
EnTc
Temporary works

Tseung Kwan O – Lam Tin Tunnel: concreting formwork platforms

Suspended formwork platforms for placing concrete around marine piles on the tunnel project.

Location
Tseung Kwan O, New Territories
Status
Completed
Category
Temporary works

On the Tseung Kwan O – Lam Tin Tunnel works, concrete had to be placed around marine piles above the water. We designed a set of formwork platforms that hang from the piles on steel beams. Each platform carries its own working deck, hinged curved formwork panels and edge protection, and can be lowered into position, opened, struck and moved to the next pile.

Drawings

Formwork platforms, stages 1–2 · 模板台 1–2
Formwork platforms, stages 1–2 · 模板台 1–2
Formwork platforms, stages 3–4 · 模板台 3–4
Formwork platforms, stages 3–4 · 模板台 3–4